Winglets and main landing gear

(Matt and Elise assist – Thanks!!)

Right winglet exterior layup installed.  Left winglet bottom fit on and clecoed in place.

Upper MLG legs wrapped with Al tape and waxed, ready to accept gear socket layups.  Six-ply triax layup wetted out on plastic and then draped over MLG upper legs. MLG cable pullies installed in front of gear bulkhead. Note that pulleys were installed wrong – cable guide tabs should be aft, in the cutout.

 

 

Unknown's avatar

Author: bzvelocity

Building a Velocity XLRG-5

Leave a comment