(Matt and Elise assist – Thanks!!)
Right winglet exterior layup installed. Left winglet bottom fit on and clecoed in place.
Upper MLG legs wrapped with Al tape and waxed, ready to accept gear socket layups. Six-ply triax layup wetted out on plastic and then draped over MLG upper legs. MLG cable pullies installed in front of gear bulkhead. Note that pulleys were installed wrong – cable guide tabs should be aft, in the cutout.