Main landing gear and doors

(Assist from Cindy – Thanks!)

Side window mating faces were ground, and side windows were glued in place. MLG legs were reinstalled and over center linkage was installed and gear pockets were adjusted so that legs were spaced evenly with centerline.  Cabo was filleted around gear sockets to adhere them to the gear pockets.  The door latching mechanisms were installed in both the pilot and copilot doors.

Piling stuff into the fuselage for shipment to Georgetown!

IMG_3497

Author: bzvelocity

Building a Velocity XLRG-5

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: