(Assist from Cindy – Thanks!)
Side window mating faces were ground, and side windows were glued in place. MLG legs were reinstalled and over center linkage was installed and gear pockets were adjusted so that legs were spaced evenly with centerline. Cabo was filleted around gear sockets to adhere them to the gear pockets. The door latching mechanisms were installed in both the pilot and copilot doors.
Piling stuff into the fuselage for shipment to Georgetown!