With the main landing gear filled and primed, and with the brake lines attached to the gear legs, I did a retraction test to make sure that there was still no interference with the MLG cutouts in the fuselage (which had to be widened slightly), and the aluminum tubing for the header tank vent and drain. The trusty nitrogen cylinder was used to do the retraction, and all was successful.
